|
PETROBRÁS - PETROLEO BRASILEIRO S.A.
Details: 3.500 m2 - S. Paulo - Bela Vista
Time of work: 120 Days
Challenge: Play the re environments from the concept of modernity serving mainly the technical standards of security systems and appropriate aesthetics.

Description: This project began with the study of materials and brominated flame retardant. At first the board wanted her to walk a radical change in the environment, replacing all existing partitions to partitions Eucatex aluminum with wood. The vast majority of companies performing divisions did not have materials rated "A" anti-retardant and non-combustible.
Our challenge now was greater, because there was a need to develop a division that would meet those standards. So we developed a partition with kernels virmiculita sandwiched between panels 02 and finished with gypsum plaster pads coated wooden blade marfim.A part has been tested for protection in the IPT and was aprovada.Todos environments board was divided on this part The floor was replaced with vinyl mats with designs PAVIFLOOR centrais.E the furniture was designed and created by VJR TRADE OFFICE to meet the needs of the space and the new aesthetic.

|