|
FNAC DO BRASIL S.A.
Details: 1.350 m2 - S. Paulo - Pinheiros
Time of work: 90 Days
Challenge:
Managing the time of the executions, services and constant design changes, along with the extra services, while still maintaining the period stipulated in the contract to the end of the work. The higher levels of complexity is given in the implementation of infrastructure - the structure of every office.
Occupy the space intelligently, respecting especially the synergy between the departments of the company, integrating the work teams has become our main concept.

Description: The office was run with calhamento floor, carpet rug in shades of blue with hatched border in shades of blue Bull, creating a special floor layout for the central corridor and reception tozetas.As divisions were organized into dry plaster requadro wall with glass in wood, with horizontal blinds inside.
The Wenge wood furniture for meeting rooms and boardrooms and laminated gray areas operating Caderode. The receptions were Porcelanatto Elizabeth floor with blue rosettes in their walls were executed in plaster pads with the application of texture interspersed with brushed stainless steel tape.

|